Introduction: Welfare and Safety Aren’t Optional
On any construction, infrastructure, or civil works site, CDM 2015 compliance isn’t just a legal box to tick—it’s the foundation of a safe, productive project.
But for many contractors and subcontractors, the challenge isn’t understanding the requirements—it’s delivering compliant welfare and safety zones without delay, overbuild, or costly concrete foundations.
This is especially difficult for:
• Early enabling works
• Short-term civils packages
• Rail possessions or phased infrastructure zones
• Remote or landlocked utility sites
The good news? You don’t need permanent buildings or months of lead time to meet the standards. In this blog, we explore how container-mounted and modular shelters allow you to create CDM-compliant zones in under a week, without pouring a single slab.
The Problem: CDM Compliance vs. Temporary Site Realities
The Construction (Design and Management) Regulations 2015 (CDM 2015) require all contractors to provide:
• Adequate welfare facilities from day one of construction
• Clear access routes, storage, and segregation zones
• Defined safe areas for rest, PPE changes, and first aid
• Proper protection from weather for both people and materials
The Issue?
Most of these sites are:
• Not ready for permanent buildings
• On tight timeframes
• Working under budget constraints
• Expected to mobilise within 5–10 days
Without fast, cost-effective shelter solutions, many contractors resort to:
• Delaying welfare until “phase two” (non-compliant)
• Renting expensive portacabin clusters (often overkill)
• Improvising with shipping containers and tarps (high-risk and unprofessional)
The Solution: Fast-Deploy Shelter Systems That Meet CDM Requirements
Modular, engineered shelters provide a compliant, flexible, and professional solution—all without groundworks or concrete.
These systems can be:
• Mounted on standard containers or weighted concrete blocks
• Installed and operational within 3–7 days
• Fully open or enclosed, with or without sides, depending on need
• Configured for break areas, drying rooms, PPE zones, and secure storage
CDM-Compliant Use Cases:
1. Site Welfare Tents
• Covered break areas with benches, heating, or welfare units
• Suitable for short-term civils teams or long-term enabling works
• Improves morale, reduces downtime, supports CDM Reg. 4
2. PPE and Clean/Dirty Change Zones
• Covered areas for donning/doffing high-risk PPE
• Keeps staff protected in poor weather or hazardous zones
• Helps meet CDM Reg. 18 (health & hygiene protection)
3. First Aid and Safety Points
• Clearly marked areas for emergency equipment or first aid responders
• Easily signposted and accessible
• Supports emergency response compliance (CDM Reg. 39)
4. Segregated Storage or Fuel Zones
• Physically separates flammables, tools, or waste from pedestrian routes
• Contributes to site safety planning and risk reduction
• Supports CDM Reg. 19 (traffic and equipment safety)
Why It Works: Fast, Flexible, Fully Compliant
Temporary shelters are no longer “make-do” infrastructure. Today’s modular systems are:
• Engineered to withstand UK site conditions (wind, snow, and loading)
• Relocatable across phases or project sites
• Expandable as your needs evolve
• Visibly compliant — impressing clients, auditors, and principal contractors
Case Study Snapshot
Client: Regional groundworks contractor mobilising for a 12-week civils package
Problem: No on-site welfare facilities, muddy ground, mobilisation required in 6 days
Solution:
• 2 x 20ft container-mounted shelters for welfare + tool storage
• Rubber floor matting + heater + signage added post-install
Outcome:
• CDM 2015-compliant site from day one
• Passed principal contractor audit without comments
• £0 spent on groundworks or cabins
Final Thoughts: Safety Isn’t Delayed — It’s Designed In
In 2025, there’s no excuse for delayed welfare or makeshift safety zones. With modular shelters, even the most challenging site conditions can be brought up to full CDM 2015 compliance in under a week.
Whether you’re a Tier 2 civils contractor, enabling works specialist, or utilities subcontractor, temporary shelters should be part of your standard mobilisation pack.
They’re affordable, auditable, and professional — exactly what your clients, insurers, and regulators expect.
Ready to Mobilise?
At Sheltirx, we help UK infrastructure contractors deliver CDM-compliant sites faster with:
• Container-mounted welfare shelters
• Tool and fuel segregation bays
• Mobile PPE and safety zones
• Custom sizing for any site layout